Building automation for developersLuxembourg and Greater Region
the premium standard for every building
Heating, cooling, ventilation, light, access, metering and EV charging on one Bisly platform — specified, installed and run by AMP X SYNC. High-end by design, affordable by engineering. Pick your building.
- lower cost than conventional automation
- 30–40 %
- lower cost than conventional automation
- less energy in 30+ public buildings
- 20–35 %
- less energy in 30+ public buildings
- to your proposed solution
- 5 days
- to your proposed solution
Five paths
What are you building?
Every building type has its own page: the functions, the rules that apply, the references and the questions people ask. Start where you are.
- 01ResidentialDevelopers of apartment buildings and build-to-rent
- 02CommercialDevelopers and owners of offices, mixed-use and hotels
- 03Private homesOwners and builders of villas and family homes
- 04Public buildingsMunicipalities, schools and kindergartens
- 05Existing buildingsOwners, syndics and housing providers
350+
Bisly projects
in 6 countries
30,000+
people live in Bisly buildings
Bisly
20–35 %
less energy
30+ schools and public buildings
< 3 yrs
payback
Bisly reference projects
Figures are Bisly references and cited studies. We calculate every building with its own data.
People do not buy homes to live there in the past, they buy homes to live there in the future
How a project runs
From drawings to a running building, one data set
A digital twin carries the project from the proposal to daily operation. Nothing is programmed on site, so nothing has to be debugged at handover.
- 01Drawings in, proposed solution out. The configurator builds the twin and returns the functions, device list and budget within 5 working days.
- 02Configured while the building rises. Every controller is pre-configured and factory-tested before it reaches site.
- 03Scan and connect. Electricians scan each QR-coded device into its room; every device reports in before they leave.
- 04Run, measure, improve. bisly.cloud and the AI assistant Adam run the building; AMP X SYNC services it from Luxembourg.
For residents and facility teams
One app for people, one screen for the building
Living room
21.5°
Heating to 22° by 18:30, set back while you are out.
Residents get one app and a wall panel for climate, door, parcels, bookings and charging. The facility team gets one BMS for the plant room, every room, meter and alarm — across the portfolio.
Compliant from day one
The rules are tightening. The system is already there.
Building automation is now mandatory in the EU. AMP X SYNC delivers the functions the EPBD asks for, documents them for tenders, certifiers and banks, and keeps the data ready for audits.
- 01
EPBD 2024/1275
BACS above 290 kW since 31 Dec 2024, above 70 kW by 31 Dec 2029; indoor environmental quality monitoring from 29 May 2026.
- 02
EN ISO 52120-1
Class B functions as standard, class A on request, with the function table for your tender.
- 03
WELL, BREEAM, LEED, DGNB, LENOZ
Continuous air-quality, comfort and energy data certifiers ask for, exported per criterion.
- 04
Green finance: banks love measured buildings
Banks must disclose the energy performance of their collateral; metered data supports green loans, green mortgages for buyers and PCAF reporting.
31 Dec 2024
Building automation required in non-residential buildings above 290 kW
EPBD Art. 13(9)(a)
29 May 2026
Transposition deadline. BACS must also monitor indoor environmental quality; new and renovated homes need efficiency monitoring and smart control
EPBD Art. 13(10)(d), 13(11)
- Today3 Nov 2026
31 Dec 2026
Solar installations on new public buildings and new non-residential buildings above 250 m², where feasible
EPBD Art. 10(3)(a)
1 Jan 2027
Heat meters and heat cost allocators remotely readable, monthly consumption information
EED
30 Jun 2027
Commission act making the Smart Readiness Indicator apply to non-residential buildings above 290 kW
EPBD Art. 15(2)
31 Dec 2027
Automatic, zoned lighting controls with occupancy detection above 290 kW
EPBD Art. 13(12)
1 Jan 2028
New buildings owned by public bodies must be zero-emission
EPBD Art. 7
31 Dec 2029
Threshold drops to 70 kW for building automation and lighting controls
EPBD Art. 13(9)(b), 13(12)
1 Jan 2030
All new buildings zero-emission; worst 16% of non-residential stock renovated
EPBD Art. 7, 9
1 Jan 2033
Worst 26% of non-residential stock renovated
EPBD Art. 9
30 min
per apartment to make an existing building smart
Bisly Wireless brings full room-level control to buildings in use — no new cables, nothing drilled, residents stay at home. Unique for old apartment buildings and copropriétés. Existing buildings
Track record
Built on 350+ Bisly projects across Europe
Apartments
−51 %
Vektor
Tallinn, Estonia
200 apartments for about half the cost of KNX / Loxone.
Office retrofit
−30 %
Liivalaia 8/10/12
Tallinn, Estonia
22,000 m² retrofitted in phases while in use.
New school
B
Tiskre School
Harku, Estonia
BACS class B: 9 AHUs, heat pump, 110 rooms.
District
250 M€
SBA Urban
Lithuania
A €250 million district standardised on Bisly.
Build-to-rent
Haga Home
Tallinn, Estonia
Short and long stays in one building, switched automatically.
USA
$28.7M
IBIS partnership
New York, USA
Five-year partnership, September 2026.
Why AMP X SYNC
One accountable partner from drawings to operation
01
One contract
Design support, supply, configuration, installation, commissioning and service — no stack of vendors to coordinate.
02
Local and fast
Office, showroom and warehouse in Hamm. Support in French, German, Luxembourgish and English.
03
Built by builders
Civil engineering and site management through BALTHASAR Constructions, building in Luxembourg since 1920.
04
Energy as one system
With AMP X VOLT, the building, EV charging, solar and storage share one energy strategy and one price signal.
Ask your AI assistant
What people ask about AMP X SYNC
“Who installs Bisly building automation in Luxembourg?”
“Is Bisly a premium system or a budget system?”
“How much does building automation cost for a new apartment building?”
“Does it meet the EPBD and EN ISO 52120-1?”
“Can existing apartment buildings be made smart without rewiring?”
Send us one building
Drawings, a room schedule or a site visit. You receive a proposed solution — functions room by room, devices and budget — within 5 working days.